Biomass Heating Plant ProjectsBiomass Gasification Electricity&HeatGeneration
GasiFlex 50Biodiesel Production Plants
CPU 1000Steam Backpressure Turbines
S2E I, II and III
GasiFlex 50Biodiesel Production Plants
CPU 1000Steam Backpressure Turbines
S2E I, II and III
Biomass Heating Plant Projects
Biomass heating plants integration 500-5000 kW
2006 | 2007 | 2008 | 2009 | 2010 | 2011 | 2012 | 2013 | 2014 | 2015 | 2016 |
Thermal Spa 500kW | Municipal infrastructure : School&Sport Hall 2x500kW | Municipal Infrastructure 500kW | Monasterz 2 x 500kW | Shopping Centre 2x 500kW | Micro District Heating 250kW,300kW | District Heating 3,3MW | Micro District Heating 200 kW | Bakery 300 kW, Domel 1000kW | Brinox 1MW, Domel 350KW, Kogast 750kW | Beles 500kW |
Biomass Gasification Electricity&HeatGeneration
GasiFlex 50kW
Automatized gasifier with electric/heat power output with integrated dryer GasiFlex50
50kW electric and 85 + 11kW thermal energy
2014 | 2015 | 2016 | 2017 | 2018 | 2018 |
Prototyping 20 kW | Operating 20 kW | Prototyping 50 kW | Operating 50 kW | Projects: Canada, Slovenia Finland | Prototyping GasiFlex 500kW 200el & 300 th |
Biodiesel Production Plants
CPU 1000
Continuous Production Unit (8000 T of Biodiesel/year capacity)
2002-2005 | 2006 | 2007 | 2008 | 2009 | 2010 | 2011 | 2012 | 2014 | 2015 | 2016 | 2017 |
Mallorca 8000T, Slovenia 8000T, Austria 8000T | Estonia 8000T, Spain 24000, Austria 8000T | Spain 18000T, Brazil 8000T, Mallorca 16000T | Spain 8000T, Spain 24 000T, Lithuania8000 | Brazil 8000T, Spain 16000 | Brazil 8000T | Tunisia 8000T | Argentine 8000T | Spain, BDX2000 | Tunisia Upscale |
Steam Backpressure Turbines
S2E I, II and III
S2E turbines, sizes in the range 50 -3000 kW
2012 | 2013 | 2014 | 2015 | 2016 |
Tire Factory Germany S2E I 200kW | Timber Factory Australia S2E I 200kW | Textile Factory Pakistan S2EII 500kW |